HQ
HQ

News

News >News NewsExhibitionActivity colorPublic Welfare

Inner Mongolia Eiwa Fluoride Chemical Co. , Ltd. . Industrial Sewage Comprehensive Utilization Proje

Posted time:2021-04-20Page view:1889

In accordance with the requirements of the interim measures on environmental impact assessment public participation (decree no. 4 of the Ministry of Ecology and Environment) , the relevant contents and evaluation results of the Environmental Impact Report on the Comprehensive Utilization Project of industrial sewage of Eiwa Fluorine Chemical Co. , Ltd. are as follows

View details

Second public announcement of the tailings dry discharge project and flotation process optimization

Posted time:2020-10-30Page view:3676

In accordance with the requirements of the interim measures on environmental impact assessment public participation (decree no. 4 of the Ministry of Ecology and Environment) , the second announcement is made on the contents and evaluation results of the environmental impact report of the tailings dry discharge project and the flotation process optimization project of Inner Mongolia Huasheng Fluorite Mining Co.

View details

Tailings dry discharge project and flotation process optimization of Inner Mongolia Huasheng Fluorit

Posted time:2020-10-10Page view:4343

According to the relevant provisions of the law of the people's Republic of China on environmental impact assessment and the measures for public participation in environmental impact assessment, the general situation of the construction project, the name and contact information of the construction unit, the network link of the public opinion form, and the ways and means of submitting the public opinion form are publicized.

View details

Inner Mongolia Eiwa Fluorine Chemical Co. , Ltd. . Technology transformation and expansion of 0.5 mi

Posted time:2020-01-02Page view:8716

In accordance with the requirements of the interim measures on environmental impact assessment public participation (decree no. 4 of the Ministry of Ecology and Environment) , the relevant contents and evaluation results of the environmental impact report of the technical upgrading and expansion of the HFC-152A project of the Inner Mongolia Eiwa Fluoride Chemical Industry Co. , Ltd. are as follows:

View details

Inner Mongolia Eiwa Fluoride Chemical Co. , Ltd. . Fluoride Chemical Change Project Environmental Im

Posted time:2020-01-02Page view:8639

View details

econd announcement of the public participation in the technical renovation and expansion of the 50,0

Posted time:2019-12-04Page view:8699

The project is located in the existing fluorine chemical plant of the ULANQAB List of township-level divisions of Inner Mongolia in Eiwa, Inner Mongolia, with an annual production capacity of 0.5 million tonnes of HFC-152a and a total investment of 21.72 million yuan.

View details

First 16 17 18 19
©2013-2018 Inner Mongolia Yonghe Fluorochemical Co., Ltd. 蒙ICP备2021004667号 HomeCompany ProfileProductsNewsFactory TourContact UsRecruitment Share
快猫视频rec05回家导航亚洲第一永久免费资源链接链接